It was a pleasure assisting our client with hydrotesting a 2 km-long pipe, ensuring compliance with B31.3 specifications. Hydrotesting is a critical step to verify the structural integrity and safety of piping systems under pressure. In this project, we not only conducted the hydrotest but also implemented a series of crucial processes, including:

  • Flushing the pipe at a specific fluid velocity to remove debris and ensure optimal flow conditions.
  • Chemical cleaning to eliminate contaminants that could compromise system performance.
  • Rust inhibitor treatment to protect the pipe from corrosion and extend its operational lifespan.

Hydrotesting, along with these essential steps, helps ensure the system’s reliability and compliance with industry standards.

Does your project require a hydrotest or other specialized services? Contact us today at 604-720-0190 or email [email protected] for expert assistance.

#dewatering #hydrotest #rustinhibitor #engineering #mechanical #seekengineering #B31.3